I have three going just now, but the lace has been put at the bottom of the list and will be there probably though September. Can’t decode on a pattern that will work for what I have in mind.
The Shawl In A Ball yarn on the 4” is still a WIP but only getting occasional attention this week.
But I have moved my planned project up to top of the list and it is getting woven a lot faster than I thought it would be. I’d like to get it done before OFFF if I can. And just as a little added interest, to myself if no one else, I am timing it. The Tiny diamonds are taking me 7 minutes each, the 7” take 20 minutes and I wove the 14” in 55 minutes. So I have this far: 35×7+ 4hr 9min. 10×20=3hr. 33min. Plus 1×55+55min. So I have 9 hours and 62 minutes of weaving time in this so far, if my math is correct. As this weaving is done while listening to the Giants baseball games and there is one of those most days/evenings, I might get this woven in about 7-8 more hours or 2 1/2 games.
Go Giants!
All manner of interesting stuff…except possibly the Giants…but if it’s as hot there as it is in Florida, any “inside in the A/C” activity gets a lot of attention.
LikeLike
Hope to see the finished project!
LikeLike